PUB POWS Submission & Engineering Support
We provide engineering-led support for PUB applications and clearance coordination for specified activities near water and sewer pipes in Singapore.
PUB POWS / Protection of Water and Sewer Pipes submission support
Preparation and coordination support for relevant PUB submission requirements.
Engineering assessment near sewer or water main
Review of proposed activity against nearby public sewer, manhole, water main or water pipe.
Construction method statement review
Check whether sequence, plant, excavation, piling or temporary works may affect PUB assets.
Sewer and water pipe protection proposal
Support for practical protection measures before and during construction.
Trial trench / services detection coordination
Coordination support for locating and verifying underground services where required.
CCTV sewer report coordination
Support for pre-condition / post-condition CCTV report coordination where applicable.
Temporary works and excavation risk review
Review for ERSS, trenching, temporary loading, access and construction risks.
Liaison support
Practical coordination with project QP, PE, contractor, architect, owner and authority.
PE endorsement where applicable
Registered PE support subject to scope, documentation and engineering review.
Need urgent submission support?
Share the site address, drawings, PUB service plan and method statement for initial review.